새 페이지 1
"DAIHAN" BK Drying Time Testing
Recorders, 3 Versions, 건조시간 측정 장치, 페인트 및
코팅제용 |
The BK Recorder defines four stages in the drying process by using moving
needle.
which travel along a coated glass test strip
* Defined Four Stage in the Drying Process
1) 1st Stage : the time taken for the solvent to evaporate.
2) 2ed Stage : an indication of the sol-gel transition zone.
3) 3rd Stage : an interrupt track, the surface-dry time.
4) 4th Stage : the final dry time, the needle no longer penetrates the film.
* The BK6 and BK10 Recorders have independently operating pairs of tracks
allowing tests
to be made at different start time. * Brass : 5 g ,
* Glass Strips : 6 ea, 300×25 mm * 240V, 50Hz
* For other modes please specify BK type, motor speed and voltage/cycles
required.
* Conformed to ASTM D5895 Test Method A.
CAT No. |
Description |
단위/갯수 |
Price(VAT별도) |
SH.BK3 |
RECORDER,drying time,6track |
EA/1 |
가격문의 |
SH.BK6 |
RECORDER,drying time,6track |
EA/1 |
가격문의 |
SH.BK10 |
RECORDER,drying time,10track |
EA/1 |
가격문의 |
|